What should you pay attention to before starting and stopping the
injection molding machine?
1. Checking of sports oil: Determine whether the amount of active oil is between the lower limit and the higher limit of the oil gauge. Is the amount of oil in a bent hand lubricated automatic injector appropriate.
2. Inspection of cooling water: determine whether there is no leakage in the cooling water piping system, and whether the amount of water is sufficient to maintain a normal cooling effect.
3. Temperature opening and inspection: determine whether the electric heating on the dryer, material pipe and crystallizer is normal, especially when the temperature of the material pipe must fully reach the set temperature, the target shooting, loosening and winch operations can be carried out .